Cause
Job Monitor columns can be dragged and dropped to new locations, but these settings are lost when exiting Taskmaster Client unless additional steps are taken.
Answer
To permanently configure the Job Monitor column order:
- With Taskmaster Client running and the Job Monitor window open, drag and drop the columns into the desired order.
- Close the Job Monitor window directly. Do not close Taskmaster Client.
- Click Yes when prompted whether to make this the default layout.
No comments:
Post a Comment